lol.
but unfortunatelly. im 99.9% sure that my car wont be finished in 3 months. grr
National Meet
Just do it, harden the fark up and do it! You have had more than enough time!
I will be doing a lot of prep work over the next 3 months. See if I cant get a few GFB's in the ute and tighten a few things up!
I will be doing a lot of prep work over the next 3 months. See if I cant get a few GFB's in the ute and tighten a few things up!
Garry. Nuff sed!
ive alrady forked out the first time i had to get it running. now i have to pay for the panel beater, thats relatively cheap as i work with him. ill paint it myself, im an apprentice spraypainter. then i have to buy an engine, get it fitted and possibly engineered. AHHHH.
wakefield might have to wait till next year. though i aim to have the boy done for the local show n shine, which is bout sept... fingers crossed.
wakefield might have to wait till next year. though i aim to have the boy done for the local show n shine, which is bout sept... fingers crossed.
[img]http://i173.photobucket.com/albums/w41/purple_monkey_fish/mightyboy.gif[/img]
Bah! Bodywork doesn't matter on the track! Stick an F8B in the nose and bring it onnnn!
F8B EFI turbo - Three pots and a snail.